ROSE RD/ TR 395 over TRIB TO LITTLE SILVR
3.5 MI S ST JACOB · County 119, Illinois · Built 1901 · 1 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
38.662589, -89.756381
This bridge is in worse condition than 54.2% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 125 years old.
Nearby Bridges
CH 13 SUMMERFIELD over LITTLE SILVER CK
Built 1969
TR 274 Cedar Road over Little Silver Creek
Built 2014
WALNUT RD/ TR 308 over LITTLE SILVER CREEK
Built 1976
TR 365 Lilac Road over Fork Creek
Built 2015
EMERALD MOUND TR 2 over LITTLE SILVER CR
Built 1964
TR11PLEASANT VALLE over BR OF EAST BRANCH
Built 1988
CYPRESS RD/ TR258 over TRIB TO LAKE FORK
Built 2005
TOWNSEND RD/ TR 5C over LITTLE SILVER CREEK
Built 1941
CH 13 SUMMERFIELD over LAKE FK CK
Built 1971
SUNNYSIDE SCH TR 2 over EAST BRANCH
Built 1941
Bridge Details
- Structure #
- 060318300000000
- Year Built
- 1901
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.9 m
- Width
- 5.9 m (19.4 ft)
- Lanes
- 1
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $79,000
- Total Project Cost
- $89,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.