IL 255 SB over Poag Rd NSRR

2.5 mi N of I-270 · County 119, Illinois · Built 1995 · 2 Lanes · 33,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
060027500000000
Year Built
1995
Length
81.9 m (268.7 ft)
Max Span
25.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
33,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.