IL 3 SB over WOODRIVER CREEK

W CITY LIMIT E ALTON · County 119, Illinois · Built 1992 · 3 Lanes · 21,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
060026800000000
Year Built
1992
Length
71.2 m (233.6 ft)
Max Span
27.4 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
21,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.