FAIRMONT LANE over FAI 55/70/US 40

1.86 MI W OF IL 157 · County 119, Illinois · Built 1960 · 2 Lanes · 1,050 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
060017000000000
Year Built
1960
Reconstructed
1984
Length
81.1 m (266.1 ft)
Max Span
23.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,050
Material
Concrete Continuous
Design
Stayed Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$553,000
Total Project Cost
$608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.