FAIRMONT LANE over FAI 55/70/US 40
1.86 MI W OF IL 157 · County 119, Illinois · Built 1960 · 2 Lanes · 1,050 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.669528, -90.042022
This bridge is in worse condition than 92.7% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 66 years old.
Nearby Bridges
BLACK LANE ramp over FAI 70
Built 1960
MSS 42 FAIRMONT AV over CANTEEN CANAL
Built 1973
BLACK LANE over CANTEEN CREEK
Built 2001
FAI 255/RDWAY""B"" over FAI 55/70
Built 1986
I 255 ""RAMP 006"" over FAI 55 70;US 40
Built 1986
OLD US 40-CVILLE R over CANTEEN CREEK
Built 1991
FAI 255 NB over I-55/70
Built 1986
FAI 255 SB over I-55/70
Built 1986
FAI 255 SB over RP 1/RDWY B
Built 1987
FAI 255 NB over RP 1/RDWY B
Built 1987
Bridge Details
- Structure #
- 060017000000000
- Year Built
- 1960
- Reconstructed
- 1984
- Length
- 81.1 m (266.1 ft)
- Max Span
- 23.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,050
- Material
- Concrete Continuous
- Design
- Stayed Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $553,000
- Total Project Cost
- $608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.