FAP 325(IL 16) over Piasa Creek

1.9 mi E FAP10/IL111 · County 117, Illinois · Built 2023 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
059250900000000
Year Built
2023
Length
9 m (29.5 ft)
Max Span
3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.