WILLIAMSON RD/SBI over I-55
.8M N STAUNTON INTCH · County 117, Illinois · Built 1973 · 2 Lanes · 1,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.031761, -89.753711
This bridge is in worse condition than 48.3% of bridges in County 117. The average bridge in Illinois is 0 years old; this one is 53 years old.
Nearby Bridges
TR 457 over FAI 55
Built 1973
STAUNTON CONNECTOR over FAI 55
Built 1975
TR 457 over STAUNTON RESERVOIR
Built 1996
FAI 55 SB over TR 439
Built 1973
FAI 55 NB over TR 439
Built 1973
ILL 4 over CAHOKIA CREEK
Built 1921
FAS 2728 over SILVER CK
Built 1983
TR 483A over BRANCH SILVER CREEK
Built 1988
ILL 138 over FAI 55
Built 1973
ILL 4 over NSRR
Built 1959
Bridge Details
- Structure #
- 059004400000000
- Year Built
- 1973
- Length
- 77.4 m (253.9 ft)
- Max Span
- 30.8 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.