FAS 1547 over LONG CREEK
1.4 MI NE LONG CREEK · County 115, Illinois · Built 1997 · 2 Lanes · 2,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.823408, -88.821519
This bridge is in worse condition than 57.8% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 29 years old.
Nearby Bridges
TR 175A over LONG CREEK
Built 2013
US 36(FAP 323) over LONG CREEK
Built 1928
TR 157A(RIDGE RD) over LONG CREEK
Built 1980
FIREHOUSE RD(1300) over LONG CREEK
Built 1960
TR 234A(ESTHER RD) over STREAM
Built 1960
TR 268(OAKLEY RD) over LONG CREEK
Built 2004
US 36(FAP 323) over TRIB TO LONG CREEK
Built 1928
LONG CR RD(MS 5000 over LONG CREEK
Built 1969
FAP 741/IL 105 over STREAM
Built 2011
US 36(FAP 323) over CREEK
Built 1928
Bridge Details
- Structure #
- 058331800000000
- Year Built
- 1997
- Length
- 40.7 m (133.5 ft)
- Max Span
- 15.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $238,000
- Total Project Cost
- $265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.