MS 1800 C over STREAM

W. BOILING SPRINGS · County 115, Illinois · Built 1982 · 2 Lanes · 550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
058327400000000
Year Built
1982
Length
19.8 m (65 ft)
Max Span
19.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
550
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.