TR 66(BAKER RD) over MOSQUITO CREEK
1.6 MI SE OF BOODY · County 115, Illinois · Built 1957 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
39.748161, -89.028139
This bridge is in worse condition than 85.8% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 69 years old.
Nearby Bridges
TR 74(HIBBARD RD) over MOSQUITO CREEK
Built 1985
TR 253(DUMMERMUTH over STREAM
Built 1983
TR 253(DUMMERMUTH over MOSQUITO CREEK
Built 1909
CH 29 (BOODY RD) over MOSQUITO CREEK
Built 2016
FAP 714(IL 48) over STREAM
Built 1991
TR 42 over STREAM
Built 1994
TR 52B over DRAINAGE DITCH
Built 2009
TR 215(ELWIN RD) over SPRING CREEK
Built 2004
TR 42BNEVADA RD over SPRING CREEK
Built 2011
TR 42(NEVADA RD) over MOSQUITO CREEK
Built 1989
Bridge Details
- Structure #
- 058312600000000
- Year Built
- 1957
- Reconstructed
- 1998
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.1 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Channel Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.