TR 30(STRAWN RD) over DITCH

IL 121 · County 115, Illinois · Built 1909 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
058309300000000
Year Built
1909
Reconstructed
1983
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$288,000
Total Project Cost
$321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.