I-72 (EB) over STREAM

1 MI SW HARRISTOWN · County 115, Illinois · Built 1976 · 2 Lanes · 7,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
058006300000000
Year Built
1976
Length
24.4 m (80.1 ft)
Max Span
22.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
7,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.