FAP 320(IL 121) over LONG CREEK

1.5 MI N MT ZION · County 115, Illinois · Built 1975 · 4 Lanes · 12,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
058005500000000
Year Built
1975
Length
69.5 m (228 ft)
Max Span
25.1 m
Width
26 m (85.3 ft)
Lanes
4
Daily Traffic
12,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,331,000
Total Project Cost
$2,720,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.