US 51(FAP 710 ALT) over NS RR & CERRO GORDO ST.
IN DECATUR · County 115, Illinois · Built 1966 · 3 Lanes · 9,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.846939, -88.95335
This bridge is in worse condition than 57.8% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 60 years old.
Nearby Bridges
GARFIELD AV(FAU 73 over IC RR
Built 1958
FAP 323(US 36) over FAU 7429(IL 48)
Built 1998
US-51 SB (FAP 710) over IL 105(FAP 712)
Built 1962
US-51NB (FAP 710AL over IL 105(FAP 712)
Built 1963
US 51 SB (FAP 710) over LAKE DECATUR
Built 1971
US 51 NB (FAP 710) over LAKE DECATUR
Built 1962
FAP 320(IL 121) over NS RR
Built 1991
IL 48(FAU 7429) over SANGAMON RIVER
Built 1929
GARFIELD AV(FAU 73 over IL 121(FAP 320)
Built 1965
IL 105(FAP 714) over SPRING CREEK
Built 1980
Bridge Details
- Structure #
- 058001400000000
- Year Built
- 1966
- Reconstructed
- 2011
- Length
- 177.1 m (581 ft)
- Max Span
- 24.7 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 3
- Daily Traffic
- 9,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,346,000
- Total Project Cost
- $3,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.