FAS 481 CH 32 over MIDDLE FORK SUGAR CR

0.5 MI ESE STANFORD · County 113, Illinois · Built 2022 · 2 Lanes · 1,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
057304000000000
Year Built
2022
Length
48.8 m (160.1 ft)
Max Span
18.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.