I-74 over DRAINAGE DITCH

10.39 M E OF BS51 · County 113, Illinois · Built 1969 · 4 Lanes · 21,600 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
057203300000000
Year Built
1969
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
21,600
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.