I-55 BUSN LOOP SB over I-74/SW BLOOMINGTON

55 BUSN LP OV I-74 · County 113, Illinois · Built 2013 · 3 Lanes · 6,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
057025200000000
Year Built
2013
Length
55.8 m (183.1 ft)
Max Span
24.7 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
6,950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.