I-55 NB over US 136/FAP 315

MCLEAN · County 113, Illinois · Built 1975 · 2 Lanes · 10,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
057015500000000
Year Built
1975
Length
66 m (216.5 ft)
Max Span
22.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.