TOWANDA AVE(FAU641 over I-55/N OF NORMAL
1.75 MI E OF US 51 · County 113, Illinois · Built 1962 · 2 Lanes · 2,650 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.538817, -88.963361
This bridge is in worse condition than 98.2% of bridges in County 113. The average bridge in Illinois is 0 years old; this one is 64 years old.
Nearby Bridges
I-55 NB over FAP 704
Built 2004
I-55 SB over FAP 704
Built 2004
I-55 BUSN LOOP over Union Pacific RR & Old 6
Built 1939
I-55 SB over FAU 6405/LINDEN
Built 2009
I-55 NB over FAU 6405/LINDEN
Built 2009
TOWANDA AVE over SOUTHERN PACIFIC RR
Built 1994
SHEPARD ROAD over N BR SUGAR CR
Built 2007
TOWANDA AVE-FAU 64 over DRAINAGE DITCH
Built 1972
FT JESSE RD-FAU 63 over BR SUGAR CREEK
Built 1985
BLAIR DR over SUGAR CREEK
Built 1991
Bridge Details
- Structure #
- 057011800000000
- Year Built
- 1962
- Length
- 67.3 m (220.8 ft)
- Max Span
- 20.6 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,650
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,018,000
- Total Project Cost
- $1,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.