I-55/I-74 NB over NS Railway & White Oak R

3.8 MI SW OF RT 51 · County 113, Illinois · Built 1963 · 3 Lanes · 21,050 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
057001800000000
Year Built
1963
Reconstructed
1999
Length
137.4 m (450.8 ft)
Max Span
30.6 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
21,050
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,242,000
Total Project Cost
$1,863,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.