BAY ROAD over LILY LAKE DRAIN

1.0 MI SE OF CHAPELH · County 111, Illinois · Built 1968 · 2 Lanes · 6,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
056310600000000
Year Built
1968
Reconstructed
2018
Length
33.4 m (109.6 ft)
Max Span
11 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
6,200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.