MS-1505 BulingtonR over E Fork Lamoine River
SE-25-T6NR3W · County 109, Illinois · Built 1931 · 2 Lanes · 550 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
40.477592, -90.676258
This bridge is in worse condition than 97.6% of bridges in County 109. The average bridge in Illinois is 0 years old; this one is 95 years old.
Nearby Bridges
NB US 67 over E FORK LAMOINE RIVER
Built 1988
SB US 67 over E FORK LAMOINE RIVER
Built 1988
FAU 6923 over Lamoine River
Built 2014
TOWNSHIP RD 1100E over IL 336
Built 2015
SPRING LAKE RD/CH over IL 336
Built 2016
IL 336 over WILDLIFE CROSSING
Built 2015
TR 129 over BR EAST FK LAMOINE
Built 2000
TR 312 over E FORK LAMOINE RIVER
Built 1986
TOWNSHIP RD 950E over IL 336
Built 2015
FAS 1438 - CH 14 over E FORK LAMOINE RIVER
Built 1959
Bridge Details
- Structure #
- 055600100000000
- Year Built
- 1931
- Length
- 32.4 m (106.3 ft)
- Max Span
- 8.9 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 550
- Material
- Concrete
- Design
- Channel Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $51,000
- Total Project Cost
- $61,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.