TR 206 over GRINDSTONE CREEK

E.CTR-29-T4NR3W · County 109, Illinois · Built 1920 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
055540400000000
Year Built
1920
Length
14.6 m (47.9 ft)
Max Span
14.3 m
Width
6 m (19.7 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Other
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$60,000
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.