TR 62 over BAPIST CREEK

NW-4-T6NR4W · County 109, Illinois · Built 1921 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
055300500000000
Year Built
1921
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$14,000
Total Project Cost
$17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.