MT PULASKI-ELKHART over SALT CK OVERFLOW

2.5 MI W MT PULASKI · County 107, Illinois · Built 1934 · 2 Lanes · 900 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
054390400000000
Year Built
1934
Length
7.5 m (24.6 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
900
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.