TR 33 over FAI 155

I-155 INT HARTSBURG · County 107, Illinois · Built 1988 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
054007500000000
Year Built
1988
Length
71.5 m (234.6 ft)
Max Span
28.3 m
Width
19.9 m (65.3 ft)
Lanes
2
Daily Traffic
600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.