FAS-348 (CH-1) over Fork of Mazon River

1 MI E OF ODELL · County 105, Illinois · Built 1983 · 2 Lanes · 250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 4 Poor
Substructure 8 Very Good

Location

41.006183, -88.493244

This bridge is in worse condition than 92.2% of bridges in County 105. The average bridge in Illinois is 0 years old; this one is 43 years old.

Nearby Bridges

Bridge Details

Structure #
053344500000000
Year Built
1983
Length
26.2 m (86 ft)
Max Span
8.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.