TR 44 over SHORT POINT CREEK

2480N 750E · County 105, Illinois · Built 1921 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
053315400000000
Year Built
1921
Length
11.6 m (38.1 ft)
Max Span
11 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Other
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$85,000
Total Project Cost
$128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.