CH-8 (FAS-1362) over Rooks Creek

0.5 MI E OF OCOYA · County 105, Illinois · Built 1966 · 2 Lanes · 800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
053301800000000
Year Built
1966
Length
40.3 m (132.2 ft)
Max Span
15.1 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
800
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.