FAI-55 SB over BR W FORK MAZON R.

3 MI SW OF DWIGHT · County 105, Illinois · Built 1972 · 2 Lanes · 10,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
053013900000000
Year Built
1972
Length
28 m (91.9 ft)
Max Span
26.2 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.