MAYTOWN RD.-TR 281 over BR. OF BUREAU CREEK

.2 MI. W. OF US 52 · County 103, Illinois · Built 1990 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
052459100000000
Year Built
1990
Length
9.7 m (31.8 ft)
Max Span
8.9 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Channel Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.