CH 15 INDIAN HEAD over GREEN RIVER RD

7.5MI W OF HARMON · County 103, Illinois · Built 2013 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
052341800000000
Year Built
2013
Length
50.6 m (166 ft)
Max Span
19.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.