US ROUTE 52 over BRNCH GREEN RIVER

3.0 MI SE AMBOY · County 103, Illinois · Built 2002 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
052007400000000
Year Built
2002
Length
28.4 m (93.2 ft)
Max Span
11 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.