TR 87 over ALLISON DR DT #1
5 MI E PINKSTAFF · County 101, Illinois · Built 2013 · 2 Lanes · 200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.791747, -87.579939
This bridge is in worse condition than 26.5% of bridges in County 101. The average bridge in Illinois is 0 years old; this one is 13 years old.
Nearby Bridges
TR 266 over Taylor Ditch
Built 2021
TR-55 over SUGAR CREEK
Built 1998
FAS 1803 CH 17 over BEAVER POND DRAIN DT
Built 1923
FAS 1803 CH 17 over OTTER POND DRAIN DT
Built 2009
TR-23 over SUGAR CREEK
Built 1994
CH-17 over DRAINAGE DITCH
Built 2005
FAS-801 over TAYLOR DITCH
Built 1957
FAS-801 over SUGAR CREEK
Built 1930
TR-274 over TAYLOR DRAINAGE DTCH
Built 1985
TR-117 over OTTER POND DITCH
Built 1994
Bridge Details
- Structure #
- 051330000000000
- Year Built
- 2013
- Length
- 15.6 m (51.2 ft)
- Max Span
- 14.8 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.