FAP 781 (IL 33) over STREAM
1.5 MI S CRAW CO LIN · County 101, Illinois · Built 2015 · 2 Lanes · 675 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.834706, -87.534278
This bridge is in worse condition than 43.2% of bridges in County 101. The average bridge in Illinois is 0 years old; this one is 11 years old.
Nearby Bridges
TR-274 over TAYLOR DRAINAGE DTCH
Built 1985
TR-13 over ALLISON DR DT #1
Built 1909
FAS-801 over TAYLOR DITCH
Built 1957
BLANN ROAD over BUSSERON CREEK
Built 1950
BOB WOLFE ROAD over LWR SHAKER PRAIRIE DITCH
Built 1997
WILSON ROAD over LWR SHAKER PRAIRIE DITCH
Built 1999
FAP 781 (IL 33) over STREAM
Built 2006
HOLSCHER ROAD over LWR SHAKER PRAIRIE DITCH
Built 1997
TR 266 over Taylor Ditch
Built 2021
TR-23 over SUGAR CREEK
Built 1994
Bridge Details
- Structure #
- 051200800000000
- Year Built
- 2015
- Length
- 22.1 m (72.5 ft)
- Max Span
- 3.6 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 675
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.