FAP-327EB (US-50) over ALLISON DITCH NO 1

2 MI E AIRPORT INT · County 101, Illinois · Built 1957 · 2 Lanes · 7,200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
051002000000000
Year Built
1957
Reconstructed
2001
Length
61.3 m (201.1 ft)
Max Span
14.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
7,200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$902,000
Total Project Cost
$1,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.