CO RD 6 over TRIB VERMILION R

N2150 E950 · County 099, Illinois · Built 2009 · 2 Lanes · 525 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
050359200000000
Year Built
2009
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Lanes
2
Daily Traffic
525
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.