IL 71 FAP 311 over MISSION CREEK

0.5 MI S OF US 52 · County 099, Illinois · Built 2010 · 2 Lanes · 4,600 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
050205000000000
Year Built
2010
Length
8.2 m (26.9 ft)
Max Span
3.9 m
Width
20.6 m (67.6 ft)
Lanes
2
Daily Traffic
4,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.