US 34 FAP 587 over SUTPHENS RUN

8.3 MI E OF I-39 · County 099, Illinois · Built 2023 · 2 Lanes · 1,600 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
050026200000000
Year Built
2023
Length
41.1 m (134.8 ft)
Max Span
15.2 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
1,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.