I-39 SB/US 51 SB over TOMAHAWK CREEK

3.5 MI N OF I-80 · County 099, Illinois · Built 1979 · 2 Lanes · 9,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
050017300000000
Year Built
1979
Length
41.5 m (136.2 ft)
Max Span
18.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
9,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.