CHECKER RD. over BUFFALO CREEK

0.45M.E.SCHAEFFER RD · County 097, Illinois · Built 1988 · 2 Lanes · 900 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
049715200000000
Year Built
1988
Length
10.9 m (35.8 ft)
Max Span
3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.