MS-1340 MAYFLOWER over RAVINE

MAYFLOWER N OF ILL R · County 097, Illinois · Built 1968 · 2 Lanes · 475 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
049685500000000
Year Built
1968
Length
92.1 m (302.2 ft)
Max Span
15.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
475
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.