CENTRAL AV over RAVINE

0.1 W LAKE MICHIGAN · County 097, Illinois · Built 2022 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
049659500000000
Year Built
2022
Length
31.9 m (104.7 ft)
Max Span
31 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.