US 41 over CREEK

S OF MILL CREEK · County 097, Illinois · Built 1999 · 4 Lanes · 24,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
049018400000000
Year Built
1999
Length
17.3 m (56.8 ft)
Max Span
3.7 m
Width
32.7 m (107.3 ft)
Lanes
4
Daily Traffic
24,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.