IL 83 NB over INDIAN CREEK

2.0 M N OF IL 22 · County 097, Illinois · Built 1994 · 2 Lanes · 27,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
049017600000000
Year Built
1994
Reconstructed
1995
Length
27.8 m (91.2 ft)
Max Span
25.3 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
27,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$438,000
Total Project Cost
$657,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.