BELVIDERE ST over C&NW RR& L.F.F-WAY.
JUST E O SHERIDAN RD · County 097, Illinois · Built 1966 · 4 Lanes · 900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.355111, -87.829219
This bridge is in worse condition than 91.2% of bridges in County 097. The average bridge in Illinois is 0 years old; this one is 60 years old.
Nearby Bridges
MARKET ST-IL 120RM over UNUSED LAND
Built 1966
IL 137 LAKE FRONT over WAUKEGAN RIVER
Built 1988
GENESEE ST over WAUKEGAN RIVER
Built 1913
WASHINGTON ST over IL 137 (LK FRT FRWY)
Built 1988
MATHON DR (GRAND A over IL 137(AMSTUTZ EXPY)
Built 1964
MATHON DR over UP RR
Built 1968
GREENWOOD AVE over UPRR
Built 1972
PULASKI DR 14TH ST over US RTE 41
Built 1979
IL 137 (LK FRT FRW over 24TH ST
Built 1989
SHERIDAN RD over 24TH ST
Built 1989
Bridge Details
- Structure #
- 049015000000000
- Year Built
- 1966
- Length
- 48.1 m (157.8 ft)
- Max Span
- 25 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 4
- Daily Traffic
- 900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.