I-94 NB over US 41 SB (SKOKIE HY)

US 41 SB 1M N IL-173 · County 097, Illinois · Built 1958 · 2 Lanes · 28,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
049009400000000
Year Built
1958
Length
61.9 m (203.1 ft)
Max Span
21.6 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
28,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$780,000
Total Project Cost
$1,170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.