IL 60 over MD FK N BR CHICAGO R

0.4 M W OF IL 43 · County 097, Illinois · Built 1941 · 4 Lanes · 23,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
049003700000000
Year Built
1941
Reconstructed
1987
Length
12.4 m (40.7 ft)
Max Span
11.6 m
Width
17.6 m (57.7 ft)
Lanes
4
Daily Traffic
23,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$361,000
Total Project Cost
$542,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.