CH 39 over SPOON RIVER

SW-34-T9NR2E · County 095, Illinois · Built 1985 · 2 Lanes · 175 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
048327500000000
Year Built
1985
Length
59.4 m (194.9 ft)
Max Span
19.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
175
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.