TR 79 over TRIB TO FOREMAN CR

E1/2-3-T12NR3E · County 095, Illinois · Built 1980 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
048322800000000
Year Built
1980
Length
15.8 m (51.8 ft)
Max Span
15.2 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.