US 150 over S. HENDERSON CR TRIB

3 MI N OF US 34 · County 095, Illinois · Built 2003 · 2 Lanes · 2,950 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
048200500000000
Year Built
2003
Length
7 m (23 ft)
Max Span
6.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,950
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.